Q1. The Incentive Amount in the Workshops are calculated by?
Answer (English): Time Saved × Average Hourly Rate of Worker
उत्तर (Hindi): समय की बचत × कार्यकर्ता की औसत प्रति घंटा दर
Q2. The annual ceiling to execute the work under the quotation powers of JAG level Officers is?
Answer (English): Rs. 60 Lakhs
उत्तर (Hindi): 60 लाख रुपए
Q3. In works tenders, the Security Deposit is collected at _______ percentage of Contract Value.
Answer (English): 5%
उत्तर (Hindi): 5%
Appendix 2a Accounts & Workshop Questions by ravigyan
Q4. The Indent Vetting by Finance is not required up to the value of?
Answer (English): Rs. 2.5 Lakhs
उत्तर (Hindi): 2.5 लाख रुपए तक वित्त विभाग द्वारा अनुमोदन आवश्यक नहीं
Q5. The Nodal Officer in charge for Budgeting, utilization of funds under Plan Head 41 is?
Answer (English): PCME
उत्तर (Hindi): PCME
Q6. GA Card in workshop means?
Answer (English): Gate Attendance Card
उत्तर (Hindi): गेट उपस्थिति कार्ड
Appendix 2a Accounts & Workshop Questions by ravigyan
Q7. During stock verification, a Stock Verifier issues a stock sheet?
Answer (English): When he finds shortages
उत्तर (Hindi): जब वह कमी पाता है
Q8. The objective of Incentive Scheme in Workshops is to?
Answer (English): To improve productivity
उत्तर (Hindi): उत्पादन क्षमता में सुधार करना
Q9. The Workshop at Arakkonam is?
Answer (English): Engineering
उत्तर (Hindi): इंजीनियरिंग
Q10. The Investments for projects on manufacture and maintenance of moving assets of the Railways are through?
Answer (English): PH 42
उत्तर (Hindi): PH 42
Appendix 2a Accounts & Workshop Questions by ravigyan
Q11. Prime Cost represents?
Answer (English): Direct Labor & Direct Materials which can be allocated to a final product
उत्तर (Hindi): प्रत्यक्ष श्रम और प्रत्यक्ष सामग्री जिन्हें अंतिम उत्पाद पर लगाया जा सकता है
Q12. The term POH in a workshop means?
Answer (English): Periodical Over Hauling
उत्तर (Hindi): समय-समय पर ओवरहालिंग
Q13. Which is the primary unit utilized for booking of expenditure on Direct Purchase?
Answer (English): PU 28
उत्तर (Hindi): PU 28
Appendix 2a Accounts & Workshop Questions by ravigyan
Q14. The authority for the Shop Superintendents to draw material for manufacture of components is?
Answer (English): Through the Job Card
उत्तर (Hindi): जॉब कार्ड के माध्यम से
Q15. The In-charge for the Repair / Production Workshops is?
Answer (English): Chief Workshop Manager (CWM)
उत्तर (Hindi): चीफ वर्कशॉप मैनेजर (CWM)
Appendix 2a Accounts & Workshop Questions by ravigyan
Q16. The Centre for Maintenance of Advanced Technologies (CAMTECH) is functioning at?
Answer (English): Gwalior
उत्तर (Hindi): ग्वालियर
Q17. Which part of the Budget indicates the funds requirement for Asset Creation / Infrastructure in Railways?
Answer (English): Capital Budget
उत्तर (Hindi): पूंजी बजट
Appendix 2a Accounts & Workshop Questions by ravigyan
Q18. The On Cost Budget in workshops means?
Answer (English): Fixing Percentages to recover the Indirect Labor & Stores
उत्तर (Hindi): अप्रत्यक्ष श्रम और स्टोर्स की वसूली के लिए प्रतिशत तय करना
Q19. The time period from the date of need of recoupment to the physical receipt of material is known as?
Answer (English): Lead Time
उत्तर (Hindi): लीड टाइम
Appendix 2a Accounts & Workshop Questions by ravigyan
Q20. Simultaneously with the posting of WGR, a summary of sub-ledger of labor and stores is prepared, which is known as?
Answer (English): Check Sheet
उत्तर (Hindi): चेक शीट
Q21. The codal life of an asset generally denotes?
Answer (English): Average economic life
उत्तर (Hindi): औसत आर्थिक जीवन
Q22. In a Workshop, URC means?
Answer (English): Unit Repair Cost
उत्तर (Hindi): यूनिट रिपेयर कॉस्ट
Appendix 2a Accounts & Workshop Questions by ravigyan
Q23. IOH (Intermediate Overhauling) is done in every?
Answer (English): Nine Months
उत्तर (Hindi): नौ महीने में
Q24. Workshop Account Current means?
Answer (English): It is Suspense Account showing the Debits and Credits Heads with Opening & Closing Balances
उत्तर (Hindi): यह एक सस्पेंस अकाउंट है जो डेबिट और क्रेडिट हेड्स को उद्घाटन और समापन बैलेंस के साथ दिखाता है
Q25. The basic purpose of costing in Railway Workshops is to?
Answer (English): To arrive at the Total cost of each item of Rolling Stock
उत्तर (Hindi): रोलिंग स्टॉक के प्रत्येक आइटम की कुल लागत ज्ञात करना
Appendix 2a Accounts & Workshop Questions by ravigyan
Q26. As per the Rules, the Review of On Cost Percentages of shops should be reviewed?
Answer (English): Quarterly
उत्तर (Hindi): त्रैमासिक
Q27. The Department responsible for processing the requirements of Rolling Stock, M&P and Works Program for Production Units, Workshops, Store Depots and Sheds is?
Answer (English): Mechanical Department
उत्तर (Hindi): यांत्रिक विभाग
Appendix 2a Accounts & Workshop Questions by ravigyan
Q28. All workshop expenditures are routed through?
Answer (English): Workshop Manufacture Suspense Account
उत्तर (Hindi): वर्कशॉप मैन्युफैक्चर सस्पेंस अकाउंट
Q29. The works for the manufacture or repair for public / private bodies undertaken in workshops are also known as?
Answer (English): Deposit Works
उत्तर (Hindi): डिपॉजिट वर्क्स
Q30. Revised Costing System implemented in?
Answer (English): Diesel & Electric Loco Workshops
उत्तर (Hindi): डीज़ल और इलेक्ट्रिक लोको वर्कशॉप्स
Appendix 2a Accounts & Workshop Questions by ravigyan
Q31. The term WGR in workshops of Indian Railways means?
Answer (English): Workshop General Register
उत्तर (Hindi): वर्कशॉप जनरल रजिस्टर
Q32. A shortage found during Stock Verification is?
Answer (English): Recovered from the Stockholder
उत्तर (Hindi): स्टॉक होल्डर से वसूल किया जाता है
Q33. After sanction of the Surveys in the Budget, Zonal Railway Administrations are responsible for submission of progress reports to Railway Board every?
Answer (English): Quarterly
उत्तर (Hindi): त्रैमासिक
Appendix 2a Accounts & Workshop Questions by ravigyan
Q34. First Incentive Scheme was introduced in CLW in Indian Railways in?
Answer (English): 1954
उत्तर (Hindi): 1954
Q35. The machines sanctioned under M&P program are normally valid for?
Answer (English): Five Years
उत्तर (Hindi): पांच साल
Q36. Earnest Money Deposit amount of successful tenderer is?
Answer (English): Retained & adjusted by the Railways as a part of Security Deposit
उत्तर (Hindi): रेलवे द्वारा सुरक्षा जमा के रूप में रखा और समायोजित किया जाता है
Q37. Pro forma On Cost is applied for?
Answer (English): Deposit works for outsiders
उत्तर (Hindi): बाहरी व्यक्तियों के लिए डिपॉजिट वर्क्स
Q38. The terms IRSP stands for?
Answer (English): Itemized Rolling Stock Program
उत्तर (Hindi): आइटमाइज्ड रोलिंग स्टॉक प्रोग्राम
Appendix 2a Accounts & Workshop Questions by ravigyan
Q39. Machinery and plant are verified?
Answer (English): Triennial
उत्तर (Hindi): त्रैवार्षिक
Q40. Form used for sending condemned material to Stores?
Answer (English): DS 8
उत्तर (Hindi): DS 8
Q41. In SR, the only Workshop which does POH of Coaches and Wagons is?
Answer (English): Carriage Works, Perambur
उत्तर (Hindi): कैरिज वर्क्स, पेरंबूर
Q42. GST is calculated on?
Answer (English): Basic Cost + Forwarding Charges + Freight Charges
उत्तर (Hindi): मूल लागत + अग्रेषण शुल्क + फ्रेट शुल्क
Appendix 2a Accounts & Workshop Questions by ravigyan
Q43. Indian Railway Institute of Financial Management (IRIFM) is situated at?
Answer (English): Secunderabad
उत्तर (Hindi): सिकंदराबाद
Q44. The chief of stores dept is?
Answer (English): PCMM
उत्तर (Hindi): PCMM
Q45. The Contribution to Provident Fund, Gratuity and Special Contribution to PF is included in the calculation of?
Answer (English): Pro forma On Cost
उत्तर (Hindi): प्रो फॉर्मा ऑन कॉस्ट
Q46. The Machinery & Plant proposals on Replacement Account is to be charged to?
Answer (English): DRF
उत्तर (Hindi): DRF
Appendix 2a Accounts & Workshop Questions by ravigyan
Q47. The Diesel Locomotive Works is situated at?
Answer (English): Varanasi
उत्तर (Hindi): वाराणसी
Q48. As per the Schedule of Powers, the definition of M&P for Tools & Plant is up to?
Answer (English): Rs. 10 Lakhs
उत्तर (Hindi): 10 लाख रुपए तक
Q49. Stock items are drawn in form No?
Answer (English): S 1313
उत्तर (Hindi): S 1313
Q50. PL number is used to denote?
Answer (English): Stock items
उत्तर (Hindi): स्टॉक आइटम्स
Q51. In Workshops, the expenditure incurred on labor and material, which cannot be directly booked to particular work order, can be charged to?
Answer (English): On Cost Work Order
उत्तर (Hindi): ऑन कॉस्ट वर्क ऑर्डर